How does a possible post-tensioned slab change a proposal to drill, anchor or inject beneath the concrete?
If the slab may be post-tensioned, identification of the slab system and the planned penetration locations belongs in the scope before drilling starts. A post-tensioning tendon contains prestressing steel held under tension. Damaging it can release stored energy and change how the concrete carries load. The fact that the contractor needs only a small opening for an anchor, core or injection hose does not establish that the proposed location is suitable.
What evidence identifies the system?
Ask for structural drawings, tendon installation records, alteration drawings and any warnings already visible on the property. Find out whether those records describe the particular slab involved. A garage addition, patio and original house can have different construction histories. A warning stamp is a useful lead; its absence cannot establish what is embedded. The homeowner can share existing documents and safely visible markings without disturbing the concrete.
A plan view alone can leave a depth question
Consider a proposed anchor beside a new support. A drawing shows its intended position in plan. The actual opening has a diameter and a depth, and the tendon also follows a path through the thickness of the concrete. A mark indicating an approximate line at the surface does not answer every clearance question. Who interprets the locating results? Which drawings, scan limits and other embedded items were considered? Who reviews a conflict if the actual position differs from the drawing?
Moving the hole can affect what the repair was designed to accomplish. A relocated anchor may change a bracket detail or load path. A different injection point may change which suspected void the contractor is trying to reach. The scope should explain who approves the revised detail before work resumes. A scan report and an engineering decision serve different purposes; ask for each where applicable.
What should a comparable proposal include?
- Identification of the slab, the exact work area and the purpose of every penetration.
- Responsible parties for field locating, interpretation, structural review and documentation.
- A procedure for unresolved or unexpected findings, with any change in scope documented before penetration.
- Final locations and documentation retained for the next owner or future trades.
Leave investigation involving cutting or drilling to qualified professionals. The Post-Tensioning Institute identifies accidental drilling and coring as causes of tendon failure and publishes a guide specifically for penetrations in slabs with unbonded tendons. PTI repair guidance · PTI openings and penetrations guide.
Have a foundation or floor-support proposal that involves an existing slab? Share the drawings and your Oregon city for a foundation repair assessment or call 541-543-8328.