Oregon foundation repair & home remodelingCCB #227476 Se habla español
541-543-8328Free estimate
← Oregon foundation repair questions

How can an inspector tell a designed duct opening from a cut web in a metal-plate-connected floor truss?

Match the opening to the drawing for that individual truss. An open-web floor truss can have a designed space for services. A sawn-off diagonal beside a new duct, a loose member, or a plate left gripping a short stub warrants investigation even when the floor feels firm. The outline of a duct opening in the next truss is only a comparison. Different truss marks can represent different supports, loads or web arrangements.

Locate the missing piece on the drawing

A metal-plate-connected wood floor truss has top and bottom chords joined by wood webs at pressed toothed plates. Those joints and webs transfer forces between the chords as the floor carries load toward its bearings. Removing one web changes that route. An I-joist chart for drilling a sheet-material web has no application to cutting a diagonal in this assembly.

Locate the unit on the floor framing plan and find its truss mark where visible. Photograph the full accessible length, identify the nearest bearing, then mark the suspect panel on a sketch. Note which end of the truss you measured from so a reviewer can distinguish the same-looking panel at the opposite end. Include the top and bottom connections, both faces where accessible, saw cuts or splits, and any plywood or lumber already fastened alongside. Note which connections a duct conceals. Avoid disturbing a plate or web to obtain a better picture.

Ask for the matching truss design drawing, placement diagram, any approved alteration or repair detail, and photographs taken before the ductwork concealed the joint. Compare panel geometry as well as the truss mark. A repair for a similar truss elsewhere can specify a different connection, access to both faces, or a different fastening pattern. The Structural Building Components Association describes the information a repair designer may need, from a marked drawing and photographs to a site visit. SBCA design of truss repairs.

Example inspection wording

Below the upstairs hall, a diagonal wood member terminates in a visible cut beside the supply duct. The opposite joint is concealed. The matching truss drawing and any repair detail were unavailable. Have the truss manufacturer or a licensed structural engineer evaluate this location before closing the ceiling.

Report visible deflection or displaced connections independently. With a visibly damaged truss, defer additional loading and have a qualified professional determine whether temporary support is needed. For an Oregon estimate to implement a documented floor framing repair, call Home Remodel Specialist at 541-543-8328.

Request a free estimate ↗
© 2026 Home Remodel Specialist · OregonPrivacy & project inquiries
Call usRequest an estimate