Oregon foundation repair & home remodelingCCB #227476 Se habla español
541-543-8328Free estimate
← Oregon foundation repair questions

A plumber cut a floor joist. How does the repair decision change if it is an I-joist instead of solid lumber?

Identify the member before anyone prices a patch. A rectangular piece of sawn lumber and an engineered I-joist carry forces through different cross-sections. An I-joist has a thin vertical web joined to top and bottom flanges. A hole through the web, a notch in a flange, and a hole that clips the flange are three different conditions. Product-specific hole charts apply only within the assumptions printed on them.

Why a hole that looks small can matter near a support

In a typical simply supported floor joist carrying distributed load, high shear occurs near the supports. The I-joist web helps transfer that force. Its flanges carry much of the bending demand. A plumbing opening close to a bearing point can interrupt a heavily loaded part of the web. Cutting into a flange changes a different part of the member. A generic “one-third of the depth” rule taken from a discussion about solid lumber cannot classify damage to an engineered product.

What belongs on the sketch?

  • Record the joist manufacturer, series, depth, spacing and any readable stamp. Ask the contractor to identify the bearing faces and clear span.
  • Show the opening’s height, width, shape and distance to the support, using the same reference points as the applicable chart. Include neighboring holes, splits, edge damage and whether a flange was touched.
  • Mark walls, posts and concentrated loads above. Weyerhaeuser describes its published hole-location chart for uniformly loaded TJI joists. A concentrated load can place a job outside those assumptions.

What does a defensible repair bid include?

If the contractor concludes the opening is permitted, ask for the matching product detail and the measurements that establish the fit. If the hole falls outside the chart, ask for a written repair applicable to the exact member, damage and load, from the manufacturer or qualified design professional. Weyerhaeuser publishes certain limited repairs for specific TJI conditions; those limits matter as much as the drawing. A different brand, a severed flange or an unidentified joist needs its own evaluation.

For sawn lumber, have the reviewer check the actual member size, notch or bore position, span, bearing and other damage against the applicable framing rules. Ask who coordinates the pipe relocation if the proposed structural repair and plumbing route occupy the same space. Do not conceal the cut before the responsible reviewer has documented it.

Weyerhaeuser guidance for holes near TJI bearing. For an Oregon estimate, send safe photos of the cut and product stamp. Joist and beam repairs · 541-543-8328.

Request a free estimate ↗
© 2026 Home Remodel Specialist · OregonPrivacy & project inquiries
Call usRequest an estimate